Bardstown Town Creek above-mentioned to pump overflow cycles 10-25-09
Video shows what appears to be the second of this mornings series of DRY WEATHER SSO's. No Rain today (10-25-09) or yesterday. This line has 2 (TWO) twelve inch lines coming together at a manhole next to this pump station and going out 1 (ONE) 12 inch line. This pump station is removing 6 inches of sewer out of the 24 inches coming together, and pumping it over the hill to another branch line, still leaving 18 inches of sewer to flow through a 12 inch pipe. When maximum capacity is reached the line starts backing up until it comes ut the lowest point in the line which just happens to be the lid on the septic tank used as a wet well.........WELL NOW U KNOW.....lol