วันศุกร์ที่ 16 เมษายน พ.ศ. 2553

June 17 City Engineer Comments #113 - Jamestown ND

Jamestown, ND (KCSi-TV News) -- On Wednesday's (Jun 17th) Wayne Byers Show on CSi Cable Channel 2, Jamestown City Engineer, Reed Schwartzkopf asked Jamestown residents to continue to observe the voluntary odd-even sewer usage program, more moderate amounts put down the drain based on house or business addresses. He said if there is no significant rain event, the odd even system will be in place until about mid-July. He added the main sewer lift station is still pumping a large amount of material, about 6.5 to 7-million gallons per day. He says the odd even system is limiting the spiking of usage, which creates more stress on the pumps. At this time the remaining lift station pumping into the river is located near the river bridge at 2nd Street Southwest. Officials will add that station to the system when the addtional amount will not significantly added to the material being pumped.



http://www.youtube.com/watch?v=t8tkFvq7VO4&hl=en

??????????????�??????????????? ??????????????????

ไม่มีความคิดเห็น:

แสดงความคิดเห็น